Moss growth destroying asphalt shingles
Metal panels give moss nothing to root into. Rain sheets off the smooth surface and debris blows away. You stop paying for moss treatments and stop worrying about what is growing under the shingles.
Metal Roof Installation Seattle WA gives you a roof that sheds rain instead of soaking it up. We install standing seam metal panels over your existing deck or new sheathing, sized for King County wind and rain loads. If your asphalt shingles are curling, moss is spreading, or you are tired of patching leaks every winter, metal ends that cycle. We handle tear-off, flashing, and cleanup in one job.

Metal Roof Installation Seattle WA is the process of fitting interlocking steel or aluminum panels over a prepared roof deck, fastened through concealed clips so no screw heads sit exposed to the weather. We start by stripping the old asphalt shingles, inspecting the sheathing for rot, then laying ice and water shield along the eaves and valleys before the first panel goes down. Panels run from ridge to eave in one piece, which means fewer seams and fewer places for water to find a way in.
Seattle roofs take a beating that most of the country never sees: roughly 38 inches of rain a year, months of damp, and moss that eats asphalt shingles from the top down. That is why so many homeowners here ask about standing seam roof installation Seattle crews can complete before the next wet season. If you have been searching for affordable metal roof installation in Seattle WA near me and getting nothing but call centers, we are a local crew that answers the phone.
Every metal roof installation we do covers the full scope from tear-off to final cleanup. We do not sub out the panel work, and we do not leave you to coordinate separate trades. Here is what is included in a standard installation, and what we handle as an add-on if your roof needs it.
We strip the old roofing down to the sheathing, load it into dumpsters, and haul it away. Disposal fees are part of the quote, not a surprise line item at the end. Most Seattle homes take one to two days for tear-off.
We check every sheet of plywood or plank decking for rot, delamination, and soft spots. Bad sheathing gets replaced before underlayment goes down. On older Seattle homes we often find rot around chimneys and valleys that was hidden for decades.
We install ice and water shield along eaves, valleys, and around all penetrations, then a synthetic underlayment across the field. This is the layer that keeps water out if a panel ever gets damaged, and it is code-required in many King County jurisdictions.
You choose the panel profile, gauge, and color. Standing seam gives you concealed fasteners and a cleaner look; through-fastened panels cost less and go on faster. We quote both so you can compare before deciding.
Drip edge, valley metal, pipe boots, ridge caps, and chimney flashing all get replaced as part of the job. Reusing old flashing under a new metal roof is the fastest way to create a leak, so we do not do it.
We run magnets across the yard and driveway to catch stray fasteners, hose-test the valleys, and walk the finished roof with you. You get warranty paperwork and care instructions before we leave.
We walk the roof, check the deck from the attic where we can, and measure every plane, valley, and penetration. You get a written quote with panel type, gauge, color, and trim listed line by line. Most quotes go out within 24 hours of the visit.
On tear-off day we strip the old shingles down to the sheathing, usually in one to two days for an average Seattle home. Any soft or delaminated plywood gets replaced before we go further. We tarp the landscaping and run magnets across the yard at the end of each day.
We roll out ice and water shield along the eaves, valleys, and around chimneys, then a synthetic underlayment across the field. New drip edge and pipe boots go on now, because retrofitting them later means pulling panels back up. This stage takes one to two days.
Panels are cut to length, lifted, and locked together from eave to ridge, fastened with concealed clips. Ridge caps, hip trim, and closures finish the edges. A typical single-family home takes three to five days for the panel work itself, weather permitting.
We run a magnet sweep for stray fasteners, hose-test the valleys and penetrations, and walk the roof with you to point out what was done. You get the manufacturer warranty paperwork and our own workmanship coverage in hand before we pull out of the driveway.
Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.
Used for fastening underlayment and sheathing, not for the metal panels themselves. Panel fasteners go in with a screw gun set to the correct torque so the washers seal without crushing.
For stripping old asphalt shingles and prying up flashing without damaging the deck. Faster and cleaner than a flat shovel, which tears up the sheathing.
For laying out panel courses and cutting underlayment and ice and water shield to fit. Straight lines matter on a metal roof because every panel edge is visible.
Keeps ladders off gutters and away from siding so we do not dent your gutter or scratch your paint. Small tool, big difference in how your house looks after the job.
For finding hidden moisture in the deck and tracking leaks back to their source. We use these during inspection so we know what we are dealing with before we quote.
For clearing needles, leaves, and debris out of valleys and gutters before and after the job. Clean valleys drain better and reduce the chance of ice dams.
A 1925 bungalow in Ballard had asphalt shingles covered in moss, with soft spots in the deck around the chimney. The homeowner was paying for moss treatments every year and still getting water stains on the ceiling.
We tore off the shingles, replaced four sheets of rotted plywood, added ice and water shield, and installed standing seam panels in charcoal gray. The install took eight working days. No leaks after two winters, and the moss problem is gone.
A windstorm peeled back a section of asphalt shingles on a West Seattle home, exposing the deck to rain. The homeowner called us at 7 a.m. and needed the roof stabilized before the next storm front arrived.
We tarped the roof by noon the same day, documented the damage for the insurance claim, and quoted a full metal replacement. The new standing seam roof was installed in six days with wind-uplift-rated panels and new flashing throughout.
A 1960s Magnolia home had a complicated roof with two valleys, a chimney, and a skylight that leaked every winter. Two other contractors declined to quote metal because of the complexity.
We walked the roof, designed the flashing details for the valleys and skylight, and installed standing seam panels over new underlayment. The install took eleven days. The skylight leak was fixed as part of the flashing work.
Most of our metal roof customers come to us because something else failed first. Here are the problems we hear about most, and how a metal roof puts them behind you.
Ask a pro →Metal panels give moss nothing to root into. Rain sheets off the smooth surface and debris blows away. You stop paying for moss treatments and stop worrying about what is growing under the shingles.
We install ice and water shield along the vulnerable areas and new flashing at every penetration, then cover it all with interlocking metal panels. Fewer seams means fewer places for water to get in.
We tarp and stabilize the roof the same day, photograph everything for your claim, and quote a full metal replacement if the roof is at the end of its life. Our crews are OSHA certified for storm-damage work.
Metal roofs shed snow faster than asphalt, and we install proper ice and water shield at the eaves to block backup. We also repair or replace gutters so meltwater has somewhere to go.
“We had moss eating our old asphalt roof for years and were tired of paying for treatments. Seattle Roofing tore off the shingles, replaced three sheets of rotted plywood they found underneath, and had the standing seam panels on in about a week. The crew swept the yard with magnets every single day. Two winters in and not a drop inside.”
Marcus T.Homeowner, Ballard
✓ Verified“Our 1940s house had a complicated roofline with two valleys and a chimney, and two other companies would not even quote metal on it. Seattle Roofing walked the roof, explained how they would flash the valleys, and gave us a written quote the next day. Install took nine days. The upstairs is noticeably cooler in July now.”
Priya S.Homeowner, West Seattle
✓ Verified“A windstorm peeled back part of our old roof and we called at 7 a.m. They had a tarp on it by noon and a full metal replacement quote to us within two days. The new panels are rated for the wind loads out here and the color matches what we picked exactly. No pressure, no upselling, just straight answers.”
Dennis R.Homeowner, Magnolia
✓ VerifiedMost standing seam metal roof installations in Seattle run $18,000 to $45,000 for a typical single-family home in 2026, depending on square footage, panel gauge, and how much deck repair is needed. Through-fastened panel systems cost less, usually $12,000 to $28,000. Steep pitches, complex rooflines, and multiple chimneys push the number up. We give you a line-item quote so you can see exactly where the money goes.
A standard Seattle home takes five to ten working days from tear-off to final walkthrough, weather permitting. That breaks down to one to two days for tear-off and deck repair, one to two days for underlayment and flashing, and three to five days for panel installation. Larger homes or roofs with complex valleys and dormers can run two to three weeks. We give you a schedule before we start and update you if rain pushes us back.
The best contractor is the one who walks your roof, shows you the panel spec and warranty in writing, and has local references you can call. We have been installing metal roofs in Seattle since 2021, we are licensed and bonded in Washington state, and we register every manufacturer warranty in your name. Ask us for addresses of recent metal roof jobs in your neighborhood and go look at them yourself.
A quality standing seam metal roof in Seattle lasts 40 to 70 years, with the finish warranty typically covering 30 to 40 years against fading and chalking. The panels themselves outlast the fasteners and washers in most cases, which is why we use concealed-clip systems that keep fasteners out of the weather. Compare that to 15 to 20 years for asphalt shingles in this wet climate, and metal wins on lifespan by a wide margin.
We are licensed, bonded, and insured in Washington state, and we have been installing metal roofs in Seattle since 2021. Call us for a free roof inspection and a line-item quote on standing seam or through-fastened panels. We answer the phone and we show up when we say we will.
Get Free Quote (844) 468-1599 →Call (844) 468-1599 any time, day or night, and a real person picks up. We schedule estimates seven days a week and dispatch emergency crews around the clock for active leaks and storm damage. Most King County addresses get a same-day visit. You can also email [email protected] and we will reply within one business hour.