Licensed shingle crews serving King County since 2021

Asphalt Roof Installation Seattle WA Built for Rain

Asphalt Roof Installation Seattle WA means tearing off the old layers, replacing rotten decking, and nailing down a GAF or Owens Corning system that sheds 38 inches of annual rain. We handle steep pitches, low-slope porches, and mossy north-facing planes across King County. If your shingles are curling, granule-bare, or leaking into the attic, we quote the job and start the tear-off.

↗
Fast online booking

Request service today

Tell us what is happening. Our local team will confirm your visit shortly.

No spam. No obligation. Just practical help.
Thanks — we'll call shortly to confirm your visit.
Asphalt Roof Installation by Seattle Roofing
Careful work. Honest options.
About this service

What Asphalt Roof Installation Seattle WA Actually Involves

Asphalt Roof Installation Seattle WA is the full tear-off and replacement of your roof surface with new asphalt shingles, underlayment, ice and water shield, flashing, and ventilation. We strip the old layers down to the deck, replace any soft plywood, then build back up: roofing felt or synthetic underlayment, metal drip edge, pipe boots, and a ridge vent sized to your attic. A standard 1,800-square-foot ranch takes two to three days with a four-person crew.

Seattle roofs fail differently than roofs in dry climates. Moss growth lifts shingle tabs, ice dams back water under the eaves in January, and flashing failure around chimneys shows up as a ceiling stain in February. If you have been searching for affordable asphalt roof installation in Seattle WA near me, the real question is whether your deck is still sound. We check that before quoting.

  • ✓ Lower Cost Per Square
  • ✓ Installed in Days, Not Weeks
  • ✓ Warranty That Transfers
  • ✓ Quieter, Cooler Attic
What's included

What Our Asphalt Roof Installation Includes

Every full install covers tear-off, deck inspection, underlayment, flashing, ventilation, and cleanup. Add-ons like skylight replacement, gutter repair, or fascia work get quoted separately so you can see exactly what each one costs before we start.

✓

Tear-Off and Disposal

We strip every existing layer down to the deck, load it into a dumpster placed on your driveway, and haul it away. Two-layer tear-offs cost more in labor and disposal, and we tell you that upfront. No old shingles get left behind or buried under new ones.

✓

Deck Inspection and Repair

Every sheet of plywood gets checked for soft spots, delamination, and water staining. Rotten decking gets replaced before anything new goes down. We photograph the deck before covering it so you can see exactly what was fixed and where.

✓

Ice and Water Shield

We run ice and water shield along eaves, valleys, and all penetrations, plus synthetic underlayment across the field. In Seattle, ice dams form at the eaves during January cold snaps, and this membrane is what stops the water from backing under the shingles and into your ceiling.

✓

New Flashing and Boots

Chimney flashing, step flashing, drip edge, and pipe boots all get replaced, not reused. Old flashing is where most Seattle roof leaks start. We rebuild the details with new metal and seal them properly, so the penetrations outlast the shingle field around them.

✓

Ventilation and Ridge Vent

A correctly sized ridge vent pairs with soffit intake to move air through the attic. Without it, heat and moisture build up, cook the shingle mat from below, and shorten roof life. We size the vent to your attic square footage and verify the intake is not blocked by insulation.

✓

Cleanup and Warranty

Magnetic sweep of the lawn and driveway, gutter blowout, and dumpster hauled the day we finish. You get manufacturer warranty paperwork, our workmanship warranty, and photos of the deck and flashing details. If a nail turns up after we leave, we come back.

How it works

Our Asphalt Roof Installation Process

01

Inspection & Quote

We walk the roof, check the attic for staining, and run a moisture meter on the decking. You get a written quote with shingle brand, color, underlayment type, and ventilation plan. Most quotes go out within 24 hours of the visit, and the price does not move unless we find rot once the old layers are off.

02

Tear-Off & Deck Repair

Crews strip the old shingles with a shingle ripper and pry bar, then inspect every sheet of plywood. Soft or delaminated decking gets replaced before anything new goes down. A 20-square tear-off takes one long day; we tarp the roof the same evening so a November rainstorm cannot get inside.

03

Underlayment & Flashing

We run ice and water shield along eaves, valleys, and penetrations, then synthetic underlayment across the field. New drip edge goes on the rakes and eaves, pipe boots get replaced, and chimney flashing is rebuilt with new step and counter-flashing. This is the layer that stops the leaks, not the shingle.

04

Shingle Installation

Shingles go down with a roofing nail gun at the manufacturer's nailing pattern, chalk lines keeping courses straight. Ridge caps finish the peaks, and a ridge vent runs the length of the top. Most homes take one to two days for the shingle phase, weather permitting.

05

Cleanup & Final Walk

We blow the gutters with a leaf blower, magnet-sweep the lawn and driveway twice, and haul the dumpster. You walk the finished roof with the crew lead, and we hand over the manufacturer warranty paperwork and photos of the deck before it was covered.

Tools & methods

Tools and Methods We Use

Purpose-built equipment, used by trained technicians — so the job is done accurately the first time.

Roofing Nail Gun

Drives shingle nails at the correct depth and pattern. We set the pressure so nails seat flush without cutting into the shingle mat, which is a common cause of premature failure on cheap installs.

Shingle Ripper and Pry Bar

Strips old shingles and lifts flashing without tearing up the decking underneath. Clean removal means we can reuse sound plywood and only replace what is actually rotten.

Infrared Leak Detector

Finds moisture trapped in the deck and insulation before we quote. It shows us the actual leak path, not just the ceiling stain, so the repair targets the source.

Moisture Meter

Checks decking and framing for hidden water content. Any sheet reading high gets replaced before new shingles go down, because trapping wet wood under a new roof guarantees rot.

Ladder Stabilizer

Keeps ladders off gutters and spreads the load against the wall. On steep Seattle pitches and older fascia, this prevents the gutter damage that happens when crews lean ladders directly on the edge.

Chalk Line and Utility Knife

Keeps shingle courses straight and cuts clean edges at rakes, valleys, and ridges. Straight courses are not cosmetic. They are how you know the nailing pattern underneath is consistent.

Real results

Before and after.

Ballard Bungalow Full Tear-Off

Before

A 1926 Ballard bungalow with two layers of shingles, moss across the north slope, and a ceiling stain in the back bedroom. The attic smelled damp and the homeowner had been patching leaks for three seasons.

After

We stripped both layers, replaced four sheets of rotten decking, and installed new GAF architectural shingles with ice and water shield at the eaves and a full ridge vent. Three days on site, no leaks through the following winter.

West Seattle Storm Damage Replacement

Before

A November windstorm peeled shingles off the north slope and exposed underlayment to three days of rain. The roof was 22 years old and already showing granule loss across the field.

After

We tarped the same day, documented the damage for insurance, and installed new Owens Corning shingles once the claim cleared. Four working days total, new flashing at the chimney, and a dry attic through the rest of the rainy season.

Rainier Valley Duplex Two-Roof Install

Before

Two adjacent units, both with two layers of old shingles and moss along the shared north wall. The owner wanted both roofs done in one mobilization to save on setup and dumpster costs.

After

We stripped both roofs, replaced the soft decking we found underneath, and installed new underlayment, drip edge, and moss-resistant shingles. Six working days total, one dumpster, one invoice, and both units dry.

Problems we solve

Seattle Roof Problems We Solve With New Shingles

Most Seattle roofs do not fail all at once. They fail at the details: moss lifting tabs, ice dams backing water under the eaves, and flashing that has quietly rusted for a decade. Here is what we fix when we install.

Ask a pro →
01

Moss growth lifting shingle tabs on north slopes

We strip the mossy layers, replace any soft decking, and install shingles with a moss-resistant granule blend. We also clear overhanging branches and re-pitch the ridge vent so the north slope dries faster between storms.

↗
02

Ice dams backing water under the eaves in January

We run ice and water shield along every eave and valley, then fix the attic ventilation that caused the melt in the first place. That combination stops the backup at the membrane instead of letting it reach your drywall.

↗
03

Flashing failure around chimneys and skylights

We rebuild chimney flashing with new step and counter-flashing, reseal or replace skylight curbs, and replace every pipe boot on the roof. These are the details that decide whether your new roof stays dry for 25 years.

↗
04

Storm damage and missing shingles after a windstorm

We tarp the damaged area the same day, document everything for your insurance claim, and either repair the section or quote a full replacement if the roof is near end of life. You get one crew handling both the emergency and the permanent fix.

↗
Proof you can check

Licensed, Certified, and Local

✓
GAF Master Elite ContractorGAF
✓
Owens Corning Preferred ContractorOwens Corning
✓
WA State Roofing LicenseWashington State Department of Labor & Industries
✓
OSHA Safety CertificationOccupational Safety and Health Administration
✓
NRCA MemberNational Roofing Contractors Association
Customer reviews

What Seattle Homeowners Say

★★★★★
“Our 1926 bungalow had two layers of shingles and moss everywhere. The crew stripped it in a day, found three sheets of rotten decking, and had ice and water shield down before the rain that night. New GAF shingles went on the next two days. The attic is noticeably cooler and we stopped getting that stain on the ceiling.”
MT

Marcus T.Homeowner, Ballard

✓ Verified
★★★★★
“I manage two rentals and needed shingle roof installation services Seattle that would not drag on for weeks. They quoted both roofs, scheduled back to back, and finished in six working days total. Photos of the deck before covering, warranty paperwork in hand, and no surprise line items at the end.”
DR

Dan R.Property Owner, Rainier Valley

✓ Verified
Good questions

Frequently Asked Questions

(844) 468-1599 →

Most Seattle asphalt roof installations run $9,500 to $24,000 in 2026, depending on square footage, pitch, and how much decking needs replacing. A simple 1,500-square-foot gable sits near the low end; a steep 3,000-square-foot home with valleys, dormers, and two layers to strip lands at the top. Rot repair, skylight replacement, and chimney flashing add line items.

A standard Seattle shingle roof takes two to four working days from tear-off to final cleanup. Single-story ranches with simple gables finish in two. Two-story homes with steep pitches, multiple valleys, and dormers take four. Rain delays in November can push the shingle phase by a day, but we dry in the same day we tear off, so the house stays protected.

The right contractor is the one who shows you the deck, names the shingle brand, and puts the scope in writing before tear-off. Look for a WA state roofing license, GAF Master Elite or Owens Corning Preferred Contractor status, and a crew that drys in the same day. We have installed Seattle roofs since 2021 and will walk you through every layer.

Architectural asphalt shingles last 20 to 30 years in Seattle, shorter than the 30- to 50-year ratings you see on the wrapper. Moss growth, year-round moisture, and shade on north-facing planes all shorten life. Keeping gutters clear, trimming overhanging branches, and treating moss every two to three years gets you closer to the top of that range.

Ready when you are

Get Your Asphalt Roof Installation Seattle WA Quote

We are licensed, insured, and installing Seattle roofs since 2021. Call (844) 468-1599 for a written quote with shingle brand, color, and ventilation plan spelled out. Storm damage after hours? We answer 24/7 and tarp the same day.

Get Free Quote (844) 468-1599 →
Request an appointment

Contact Seattle Roofing

Call (844) 468-1599 any time, day or night, and a real person picks up. We schedule estimates seven days a week and dispatch emergency crews around the clock for active leaks and storm damage. Most King County addresses get a same-day visit. You can also email [email protected] and we will reply within one business hour.

Call anytime(844) 468-1599Email the office[email protected]
Office hoursOpen 24 hours · 7 days a week
Request received — our team will be in touch shortly.
Tap to call(844) 468-1599